• City of Sydney logo
  • Flood model information application form

  • Which flood study data and digital TUFLOW model/s do you require?

  • Terms and conditions of access to the materials

    Access to this material is permitted under the following terms and conditions:
    1. The above materials have been prepared for the City of Sydney in response to the assumptions, methodology and findings documented in the corresponding reports.
    2. Access is granted for informational purposes only. The accessing person reviews, interprets and applies any part of the materials at his/her whole and sole risk. The City of Sydney does not in any way warrant the accuracy of any part of the material.
    3. Without limiting (2), it is the responsibility of the accessing person to assess and verify the suitability of the information and datasets for their own purposes. In particular, the adopted assumptions, datasets and configuration cannot be assumed to be correct by the accessing person. Access to the materials does not displace, or replace, the proper analysis of performance of private land.
    4. The information and data sets remain the property of the City of Sydney and are not to be copied, reproduced or released without the express and written permission of the City of Sydney. To the extent that any material, reports, analysis or other information uses any part of the material, the accessing party must acknowledge the source of the information.
    5. The accessing party acknowledges the material has not been commissioned by or for the benefit of the accessing party. No claim, or action, of any nature whatsoever may be brought by or on behalf of the accessing party against the City of Sydney or the author of the material arising out of or resulting from the access to, or use of, any part of the material.
    6. Without limiting (5), the accessing party expressly acknowledges that the material contains assumptions and predictions based on findings which precede the publication of the material. No claim may be made by or on behalf of the accessing party against either the City of Sydney or the author of the material by reason that any part of the material is demonstrated or proven to be incomplete, incorrect, or inaccurate.
  • Privacy protection notice

  • Purpose of collection: This information is being collected for the purpose of providing floodplain catchment study data and models.

    Intended recipients: City of Sydney employees.

    Supply: The supply of this information is voluntary. If you are unwilling to provide this information, the City of Sydney may be unable to provide access to City of Sydney services.

    Access/Correction: The City Infrastructure & Traffic Operations unit at the City of Sydney, located at 456 Kent Street, Sydney NSW 2000, is collecting this information and will store it securely.

    Storage: City Infrastructure & Traffic Operations at the City of Sydney, located at 456 Kent Street, Sydney NSW 2000, is collecting this information and the City of Sydney will store it securely. 

    Other uses: The City of Sydney will use your personal information for the purpose for which it was collected. 

    For further details on how the City of Sydney manages personal information, please refer to our privacy management plan.

     

  • Should be Empty: